TVA Shawnee Power Plant - West Paducah, Kentucky
Address: 7900 Metropolis Lake Rd, West Paducah, KY 42086, United States.
Phone: 2705758000.
Website: tva.gov
Specialties: Electric utility company.
Other points of interest: Wheelchair-accessible car park, Wheelchair-accessible entrance.
Opinions: This company has 11 reviews on Google My Business.
Average opinion: 4.5/5.
đ Location of TVA Shawnee Power Plant
The TVA Shawnee Power Plant, operating under the authority of the Tennessee Valley Authority (TVA), stands as a significant component of the region's energy infrastructure. As a key fossil fuel facility within TVA's diverse generation portfolio, it contributes substantially to the power supply across parts of Kentucky and Tennessee, serving the energy needs of numerous residential, commercial, and industrial customers.
Operational Foundation and Role
Owned and managed by the Tennessee Valley Authority, a federal agency chartered nearly a century ago to address economic development and resource management in the Tennessee Valley, the Shawnee facility represents the ongoing reliance on coal power generation in certain parts of the United States. TVA continues to operate a mix of energy sources, including coal, natural gas, nuclear, wind, and solar, to meet regional demand while navigating the complexities of energy policy, environmental regulations, and the transition towards cleaner energy alternatives.
The plant's primary function involves the transformation of raw coal into electrical power through a well-established process of pulverization, combustion in boilers, steam generation, turbine rotation, and ultimately, electricity generation. While integral to the regional grid's stability, its operation is subject to stringent environmental oversight regarding emissions, water usage, and solid waste management, reflecting a growing societal emphasis on sustainability and reducing the carbon footprint of large industrial facilities.
Geographical Location and Address
Nestled within the western Kentucky landscape, the TVA Shawnee Power Plant is strategically situated near the city of West Paducah. Its specific location is provided via its official address: 7900 Metropolis Lake Road, West Paducah, KY 42086, United States. Situated along Metropolis Lake Road, this positioning facilitates both operational logistics and, importantly, access for visitors and stakeholders. The plant's proximity to Paducah, a city historically linked with the chemical industry (notably the nearby Nitrocellulose plant) adds a layer to the local socio-economic tapestry, representing a significant employer and economic force in the surrounding Paducah metropolitan area.
West Paducah, KY, serves as the base for this power generation facility, placing it within a specific county and region known for its agricultural and industrial activities. The choice of location likely considered factors such as access to transportation networks for coal delivery (historically a major factor in coal plant siting), availability of water resources for cooling purposes, proximity to population centers, and land use regulations. Understanding this geographical context is crucial for anyone planning a site visit, commuting to work at the plant, or assessing its impact on the local environment and community.
Contact Information and Web Presence
For inquiries, operational details, or general information regarding the plant's role within TVA's network, the facility provides designated channels for communication. The primary contact number is listed as Phone: 2705758000. This direct line likely connects callers to relevant departments within TVA, potentially including operations, customer service, public relations, or tours and facility information. While specific protocols for general inquiries versus technical ones might exist, this phone number offers a point of access for external communication.
Additionally, the plant maintains an official digital presence through the broader TVA website. Access detailed information about the Shawnee facility, its operational status, its place within TVA's fossil fuel fleet, and potentially historical context or environmental initiatives can be found at the following URL: Website: https://www.tva.gov/Energy/Our-Power-System/Coal/Shawnee-Fossil-Plant. This online resource is part of TVA's commitment to transparency, providing data on generation output, contributing to regional energy profiles, and explaining the role of coal plants within their integrated system.
Facilities and Accessibility
Considering visits or professional access, the TVA Shawnee Power Plant is mindful of providing practical support and accessibility for visitors. Specific arrangements for tours, meetings, or site access would likely need to be coordinated through TVA channels, potentially referencing the contact number provided. Beyond general operational access, the facility demonstrates consideration for diverse visitor needs by ensuring its physical infrastructure meets basic accessibility standards. Notably, the plant features wheelchair-accessible parking and wheelchair-accessible entrances, ensuring that individuals with mobility impairments can navigate the site and potentially participate in certain visitor programs or access public areas with reasonable ease. This focus on accessibility reflects a commitment to inclusivity and regulatory compliance.
Community Perception and Reputation
The public perception of the TVA Shawnee Power Plant is reflected indirectly through online review platforms. According to available data, the facility maintains a presence on Google My Business, where it has garnered 11 reviews from the community. These reviews offer valuable, albeit potentially anecdotal, perspectives from individuals who may have visited the facility, worked there, or interacted with its services. Impressions expressed in these reviews can vary widely, but collectively they contribute to the plant's community image.
Crucially, the average rating across these 11 reviews stands at an impressive 4.5/5. This high score suggests a generally positive community standing, potentially indicating factors such as perceived reliability in energy supply, satisfactory interactions with TVA representatives, or positive contributions to the local economy. High ratings often correlate with effective community relations, operational transparency, and a workforce that fosters a positive external image. Conversely, low ratings might prompt scrutiny regarding environmental concerns or operational impacts. This average score provides a quantitative snapshot of public sentiment towards the facility, useful for gauging its community impact.
Understanding the Facility's Role in Energy Transition
While serving as a vital operational asset for TVA, the Shawnee Power Plant also exists within a broader context of national and international energy transitions. The increasing focus on reducing greenhouse gas emissions and phasing out coal in many regions means the future of facilities like Shawnee is under constant review. TVA, like many utility providers, is investing in and developing a greater proportion of its generation capacity from renewable and lower-emission sources. The long-term operational status, potential upgrades to reduce emissions, or eventual decommissioning pathways for coal plants are topics under ongoing discussion within TVA and the regulatory landscape, impacting the facility's future relevance and legacy.
Technical Specifications and Operational Parameters
While specific, highly detailed technical data such as unit capacities, exact boiler types, turbine efficiency figures, or pollution control system specifications are typically proprietary information, public sources like the TVA website offer some level of detail. Generally, large fossil fuel plants like Shawnee operate with multiple generating units, each with significant capacity. These units run on pulverized coal, which is burned in large boilers to produce steam that drives turbines connected to generators. Advanced facilities often incorporate technologies like electrostatic precipitators or scrubbers to capture particulate matter and sulfur dioxide, minimizing air pollution. The plant's efficiency and operational profile are critical factors in its economic viability and environmental impact assessment, though detailed figures would require accessing official TVA reports or technical documents.
Water Usage and Environmental Management
The operation of a large power plant, especially one using fossil fuels, requires substantial amounts of water for cooling processes. Understanding the source and impact of this water usage is essential. While the specific water source for Shawnee (likely surface water from nearby lakes or rivers, or potentially groundwater) and the plant's thermal discharge practices are important environmental considerations, detailed information might be found in TVA's environmental compliance reports or publicly available data. TVA is required to adhere to strict regulations regarding water withdrawal and discharge, ensuring minimal impact on local aquatic ecosystems. Balancing the need for vast quantities of water with environmental stewardship remains an ongoing challenge and focus area for facilities like Shawnee.
Workforce and Local Economic Impact
The TVA Shawnee Power Plant represents a significant employer in the West Paducah area, providing stable, often well-compensated, technical and skilled labor positions. Jobs range from engineers and technicians overseeing complex systems to operators working directly on the plant floor, maintenance personnel, administrative staff, and potentially support services. This workforce requires specialized training and expertise, contributing to the local technical education and training landscape.
Beyond direct employment, the plant contributes substantially to the local economy through various channels. It necessitates the supply chain for coal (although coal sourcing patterns have evolved with market dynamics and environmental policies), provides services to vendors and contractors, pays property taxes, and contributes to local sales and income taxes. The presence of a large industrial facility like Shawnee can influence local infrastructure needs (e.g., transportation, utilities), land use planning, and overall economic development strategies in the surrounding community. Evaluating this economic footprint is crucial for understanding the plant's holistic impact.
Public Engagement and Community Relations
Large industrial facilities like the TVA Shawnee Power Plant operate within a community context, necessitating ongoing public engagement and community relations efforts. TVA engages with the public through its website, reporting on plant performance and environmental metrics, participating in public meetings regarding regional energy planning, and potentially hosting educational tours (subject to safety and operational constraints). Addressing concerns related to emissions, traffic, noise, and land use requires transparent communication and adherence to regulatory standards. The high average customer rating on Google My Business (4.5/5) may suggest that these efforts have been largely effective in maintaining a positive relationship with the surrounding community in West Paducah and the wider region.
Historical Context and Operational Timeline
To fully appreciate the Shawnee facility, understanding its history is beneficial. While the exact dates of construction and initial commissioning might require specific historical records, large fossil fuel plants typically have decades-long operational lives. Shawnee likely began operations sometime in the latter half of the 20th century, contributing to the region's power grid during a period of significant industrial and population growth in the Tennessee Valley.
Over the years, the plant has undergone numerous upgrades and modifications to improve efficiency, meet evolving environmental regulations, and adapt to changes in fuel availability and market conditions. The transition from older, less efficient coal technologies to modern, cleaner-burning units is a common narrative in the industry. Understanding the plant's evolution provides context for its current operational characteristics and its future trajectory as the energy sector continues to transform.
Comparison with Other TVA Generation Assets
Considering the TVA Shawnee Power Plant in isolation is insightful, but placing it within TVA's broader generation mix provides a more comprehensive understanding. TVA operates a diverse array of power plants across its vast service territory, including numerous hydroelectric dams (which provide clean, renewable power), nuclear facilities (offering baseload power with low emissions), combined-cycle natural gas plants (often providing flexible, lower-emission generation), and renewable sources like wind and solar farms.
The role of a facility like Shawnee is typically as a coal-fired baseload or peaking plant, depending on its design and economic competitiveness. Baseload plants operate continuously at high capacity to meet the minimum energy demand, while peaking plants operate during periods of peak demand. Depending on its specific capacity, efficiency, and the cost of coal versus alternative fuels, Shawnee might fit into one or the other role, or a combination. Its performance and utilization rates are compared against other units within TVA's fleet, influencing decisions regarding operational dispatch and long-term investment strategies. Understanding TVA's overall portfolio helps contextualize the specific contribution and necessity of the Shawnee plant.
Conclusion: A Cornerstone of Regional Energy
In conclusion, the TVA Shawnee Power Plant is a substantial and integral part of the energy infrastructure serving the Tennessee Valley region. Operated by the Tennessee Valley Authority from its base at 7900 Metropolis Lake Road in West Paducah, Kentucky, the facility generates electricity using coal, contributing to the grid's reliability and powering thousands of homes and businesses. While facing scrutiny regarding environmental impacts and the long-term future in a shifting energy landscape, it remains a physical anchor in the local community, providing employment and economic activity.
For those seeking detailed operational data, scheduling a site visit or tour (if available), or contacting TVA about specific matters related to the plant's operations, the official phone number (2705758000) and website (https://www.tva.gov/Energy/Our-Power-System/Coal/Shawnee-Fossil-Plant) are the primary resources. Furthermore, knowledge of its wheelchair-accessible features (parking and entrance) is important for planning accessibility. The positive community feedback reflected in the 4.5/5 average rating from 11 Google reviews underscores its generally stable and accepted role within the region's energy framework and local community fabric.